What (a) number of laboratories does the SA Bureau of Standards have, (b) number of the specified laboratories are conducting full testing of products, (c) are the names of the laboratories that are conducting partial testing of products, (d) would it cost to bring each partial testing laboratory up to standard so that full testing can be conducted at every laboratory and (e) equipment is needed at each laboratory?