With reference to his reply to question 604 on the 24 April 2017, (a) what was the cost of each borehole (i) drilled per meter, (ii) refurbished and (iii) equipped, (b) what type of (i) pump and (ii) equipment was installed and in each case and (c)(i) who was responsible for the maintenance and (ii) at what cost?