3.5 It was pointed out that over the MTEF period, savings of R771.4 million were expected to be realised from foreign exchange rate gains. Allocation of R384 million in 2010/11 and R138 million in 2011/12 for the construction of the Pan African Parliament (PAP) has been removed from the Department's baseline, alternative methods of funding will be explored.