1. INFRASTRUCTURE 1.1 During its orientation briefing, the Committee was informed that the buildings at the base were in a dire state of neglect. Three messes required urgent renovation, as well as the married quarters. During a brief tour of the facilities, the Committee confirmed that certain facilities require extensive repair and renovation. Water damage as a result of the outdated plumbing systems (drains and drainpipes) and regular geyser bursts caused the roofs and floorboards to rot. Stairways were slippery and also required urgent renovation. The Committee is concerned that such deteriorating conditions pose occupational health and safety risks and negatively impact on the morale and work ethic of members of the SAAF.