(1)With reference to the bilateral agreement signed between the government of Zimbabwe and the Republic to transfer treated water from Beitbridge Water Treatment Works in the Republic of Zimbabwe to the Musina Local Municipality, what (a) will be the cost for a cubic metre of water and (b) are the relevant details of the guarantees provided by the Government;
(2) (a) who will be responsible for the construction of the water pipeline, -(b) what is the total cost of the specified construction and (c) by what date will the water be delivered and used by the specified local municipality
(3) whether the bulk of the water will be channelled to the Musina-Makhado Special Economic Zone; if not, what is the position in this regard; if so, what are the relevant details?