. The Overload control Grant aimed at preserving road infrastructure by ensuring that overloading practices are significantly reduced. With a three year life span, the grant is allocated R10.069 million in 2009/10 and R11.038 million in 2010/11. The allocation for 2009/10 is divided between Gauteng (R5.034 million) and Limpopo (R5.035 million), while the 2010/11 allocation will go to the Eastern Cape (R5.519 million) and Mpumalanga (R5.519 million). While the grant has been in existence since 2008/09, no transfers were made from national to province in respect of this grant.