3.2.2 Inspection of the nurse's station at the Medium A centre revealed that it was nothing more than a small, dark and damp room, with hardly any ventilation or room for adequate consultation. The area reported that an air-conditioner had been ordered for the Medium A nurses' station. An empty cell next to the nurses' station would be converted to a sickbay. The area had applied to have the Medium A 'clinic' renovated, but instability at centre management level has resulted in delays in that process. The clinic in the Maximum centre exhibited the same dilapidation. The DCS was considering renovating the Medium A clinic, and the DPW would be approached to include this renovation as part of the RAMP project. The ARV clinic was being renovated at the time of the visit, and would have become operational again on 30 April 2012.