Construction costs of RDP House | |||
Province | Average Cost Urban Rural Disable | |||
1. Eastern Cape |
N/A R 170 000.00 |
R 190 000.00 |
N/A |
|
2. Free State |
N/A R 136 164.00 |
N/A |
N/A |
|
3. Gauteng |
R116 000.00 |
N/A |
N/A |
N/A |
4. KwaZulu Natal |
R 172 853.00 |
N/A |
N/A |
R 228 914.00 |
5. Limpopo |
R 92 600.00 |
N/A |
N/A |
N/A |
6. Mpumalanga |
R 125 000.00 |
N/A |
N/A |
WA |
7. Northern Cape |
R 123 829.00 |
N/A |
N/A |
N/A |
8. North West |
R 113 539.38 |
N/A |
N/A |
N/A |
e. Western Cape |
R 164 856.00 (Simplex) R 183 856.00 (Duplex) |
N/A |
N/A |
N/A |
2. It must be noted that the construction cost is separate from the cost of land as well as provision of water and sanitation. These costs per uniVhouse can be broken down as follows:
3. The National Department provides the Provinces with a sector adopted subsidy quantum guideline which allocates R168 852 per house as follows:
The main reasons for the variances includes amongst others the following:
In most cases implementation of Rural Housing Programme cost less than that of Social Housing Programme such as Community Residential Programme.
In urban areas, bulk has to be provided before top structure can be constructed and the costs of that bulk are included in the total cost of the construction.
The environmental conditions of coastal areas differs significantly to those of inland Provinces and this pushes the costs of constructing houses for mainly coastal areas with prolonged rainy seasons.
In certain Provinces, building material has to be acquired in Metropolitan areas such as Gauteng and the cost of transport has a cost bearing in the acquisition of building material.
For rural areas, the cost of labour is less as compared to urban areas and construction costs end up belng lesser as a result.
NATIONAL ASSEMBLY QUESTION FOR WRITTEN REPLY QUESTION NUMBER: PQ 1367
DATE OF PUBLICATION: 11 MAY 2018
F MATLATSI
CHIEF FINANCIAL OFFICER
DATE:
Recommended/
N CHAINEEDDG: STRATEGY AND PLANNING DATE: + z g "
Approved/Not approved
MINISTER FOR HUMAN SETTLEMENTS
DAYE:
Annexure A
Annexure B
COST BREAKDOWN OF MUNIOPAL ENGINEERING SERVICES - DIRE€T COST IMPLEMENTATION DATE: 1APRIL 2018
A GRADE SERVICES: DIRECT COST |
||||||||
Zonlng |
size In m' |
<< front |
water |
Cost of sewer cost |
Cost of roads cost |
Cost of stomi wmer |
Cast o£ high mast |
Total cost per unit |
Rest |
243 |
9m |
R4140.12 |
R7210.41 |
R23570.60 |
R4153.81 |
R0.OJ |
R39074.94 |
294 |
10m |
R4471.07 |
R7795.38 |
R26516.53 |
R5019.15 |
R0.IXV |
R43802.M |
|
122 |
5n |
@l2fB03f@ |
R9#869t48 |
R11784.77 |
R2076W |
RO.IXI |
R21534.27 |
|
236 |
10m |
R4471.07 |
R7795.38 |
R26S16.53 |
R4027.33 |
RO.OJ |
R42810.32 |
Most cost effective stand !s one with astraet from of em u 243m'ata cost ofR39 O74,94 plus Indirect eost
at R6 91O,32totaIIlng to RJ5 985,00
B GRADE SERVICES: DIRECT ODST |
||||||||
zoning |
Size(m*) |
street |
«we‹ |
water system |
high mast lighting |
Total Cost per unit |
||
Res 1 |
294 |
10m |
R5215.19 |
R9278.36 |
R 11877.53 |
R2748.83 |
R2387.31 |
R31507.22 |
243 |
9m |
R4849.45 |
R9278.36 |
R10557.92 |
R2274.53 |
R2387.31 |
R29347.58 |
|
122 |
4.5m |
R3389.66 |
] R9278.36 |
R5278.43 |
R 1137.27 |
R2387C1 |
R21471.03 |
|
236 |
10m |
R5215.19 |
] R9278.36 |
R11877.53 |
R2206.02 |
R2387.31 |
R30964.41 |
iviost cost effective street fzont 1s 9m at Z43 m'ata ‹x›st oFR29347,58 plus Indirect cost
R6 91O,32totalllngto R36 MB.00
Annexure C
SERVICED STAND: COgT BREAKDOWN OF MUNIOPAL ENGINEERING SERVICES: INDIRECT COST IMPLEMENTATION DATE: 1APRIL 2016 |
|||
Indirect cost |
oetall description |
Cost per unft |
|
Safety Inspector |
Six month project duration |
R 101.18[ |
|
Environmental Control officer |
Six month project duration |
R 101.18 |
|
Pre planning studies |
EIA, excl. specfallst studies and Wula |
R 527.00] |
|
Trafic Impactstudy- Capacity analysis at7 intersections |
R 103.29 |
||
Urban design |
R 316.20 |
||
Project management |
SACPMP Gazetted fee scale with 20f£ discount |
R 1586.80 |
|
Geotechnical evaluation |
GFSH2 Phase 1 |
R 110.67 |
|
Contour survey |
Greenfields pro |
W |
R 31.62 |
Land survey and pegging |
Greenfields pro |
lect |
R 316.20 |
land survey examination fee |
Greenfields pro |
ect |
R 68.51 |
Town planning |
SACPLAN |
R 388.08 |
|
Civil Engineer |
ECSA Gasetted fee scale wolth 203£ discount |
R 2 37B.00 |
|
Site supervision- civil |
Conmcutlon period of 6 months |
R 505.92 |
|
Socclal facilitation |
R 333.50 |
||
Legal fees |
Conveyancing Certificate |
R 42.16 |
|
Total |
R 6 910.32 |
Annexure D
DETAILED COSY BREAKDOWN OF 45 SQUARE NIETRE HOUSES FOR DISABLED PERSDNS ON WHEELCxxiR uszD BASED ON SANS 1os00 XA AND HIGHER SPECIFICATION IMPLEMENTATION DATE: 1APRIL 2018 |
DEPENDANT |
Cost element |
Cost |
Foundations |
R 11 708.51 |
Ground floor constrcution |
R M 064.18 |
External envelope |
R 26 553.41 |
ftoof |
R 8 614.73 ) |
Ceilings and insulation above ceili>8 |
R 8 6B4.59) |
Internal divisions |
R 14 713.48 |
Floor finishes |
R 9 286.06( |
internal wall finishes |
R 21 990.30} |
Plaster of internal walls |
R 1915.70 1 |
Windows: Special Low E clear and opaque glass |
R 4 778.60[ |
Electrical intsallation |
R 11 150.851 |
lnternaljzlumbing |
R 12 758.71) |
Site clearance |
R 3 161.261 |
P&Gs |
R 12 774.10) |
Sub Total A |
R 161 154.49] |
Project management |
R S 639.9S) |
Clerk of works |
R 4834.70) |
Sub TotalC |
R 171 629. |
Transfer fees |
R 1000.00) |
Beneficiary administration |
R 300.00 |
Total R 172 92S.14) |
|
Total Rounded Ott R 172 929.00) |
Annexure E
DETAILED COST BREAKDOWN FOR MILIYARY VETERANS 50 SQUARE METRE HOUSE IMPLEMENTATION DATE: 1APRI1 2018 |
||
CO5t Cleft+Drtc» |
Cost |
|
Earthworks |
R 7 782.06 |
|
Concrete, Fromwork & Relnforcement |
R 12 923.00 |
|
Brickwork |
R 22 956.16 |
|
Roof Structure |
R 19 031.56 |
|
Ceiling |
R 7 788.29 |
|
Above ceiling insulatiDFl |
R 1657.59 |
|
Windows standard |
R 3 711.18 |
|
Windows special low e clear and opaque glass |
R 4 206.Y2 |
|
DODrs and Frames |
R 6 677.86 |
|
Finishing and paintwork |
R 19 448.14 |
|
Electrical |
R 11 852.93 |
|
Floor and wall tiling |
R 12 769.34 |
|
Plumbing and tollet plus rain water disposal |
R 18 138.74 |
|
2 plate hob |
R 414.40 |
|
/Jo\nery |
R 3 729.57 |
|
Carport |
R 13 023.90 |
|
Fencing (32,5m) |
R 3 655.57 |
|
Sub total A |
R 169 767.03 |
|
P & G |
R 15 431.56 |
|
Sub totel B |
R 185 198.S8 |
|
Clerk of works |
R 5 807.54 |
|
Project manager |
R 6 707.66 |
|
Transfer cost |
R1 000.00 |
|
Beneflary administration |
l R 300.00 |
|
Total |
R 199 013.78 |
|
Total rounded off R 199 014.00 |
EMERGENCY ASSI6yANCE PROGRANIME: Grant amounts applicable aa ›rom 1 April 201B
TEMPORARY ASSISTANCE
ITEtg
a] Inalcect CoeB:
Benegelafy Admlfdstratton 6cfaty lns0actor(DoL) Envlenmental Control Olficar
Pre-OlannlnB studies
Geo-technical InvestQallon(lfamllcabe)
Contour Survay Q]
Land sunreyka and 8ke megN (gl
Land aurvay(Surva r Genaml) axamlna8on fee l4J
(tI]T0wnshh eetabllshment
Civil En0ln0ar: 6arvlces deslgn 6 Site 6ug•lvlsIon:
Lagal FeeE (If applicable)(ramal ageemeNs) [b] Madletlou 6 Conflict Rasdutlon l6]
6ab•YoB1: Indirect Coets gsr atand ay Dlraat co6t:
Weter faflculation on shafad basis
Sanaatlon on shered baals Roads (Main acce6s] Stom Watar
Sub•TotaJ: DJract Cost
TOTAL sTAND CO6T{portion af an ordinary stsna anacaa octween b un\aj}
R 31640 R 01.2t R 73.03 R 48e.35 R 97.42
R 27.40
R 18.24 R BI.58 R ZB.32 R 5064
R 72.bb R 5248 R 14B.36 R 64.05
R 6.46
R 51.95
R 1 660.16
1 310A8
1 ZZ4.84 B68.4g 541.82
3 846A2
IRoofshastlro I covarlra [Side Cladding / Wall Claddlng IColumn8 snd anchor boIB
]Coiumn footlnos: Concfeta basaa for structure wst8
I Rallatfi
[Purlins
}D0O£ & Wl£IdOW gOBt0 8fId fTBfI186 lSl4a tag6 to swPorl side cBddkig [FI8Shin@s
lDoor
]Wlndow
I R B 898.89”
L R 11 382.52
} R b 736.b3
I R1620.76
I RS124.76
I R4O56A1
I R2717.44
I R3327.01
I R974.14
I R2500.65
) R2424.05
{ R811B.13
[Thofmal lnwovomant undar fool I R2922.53
ICub-Total:
ETOTAL 8HEL7ER GOBT
/GRAND TU j AL PER GRANT
ReBalr of aervf«ea to Mattanal Nums ana Standards: B Gtaae Lav8I: Up to a auiaeline amount of Ragalr of aervfaes to Matlonel Norma and 8tandarda: A Grade Level: Ue to a Ouldellne amount af
[Rapalr of axiatlng formal ecuctuce accwdlng to National Noms and $tandarda 'S0sgm) w Ie an amovnt ef:
despair of exteacg tomal atructuce aceorz0ng to NsBonal Norma •nd Btandarda (40agmJ
Replacent ef aameeea heuaa wnh n•w etrumura: t» j
(1] If the Munlafpallty cannot manega the project
[Z] Only lf•lte ie to be •••ad ror temporary settlement with e permanent housing solution, or for scoping atudy.
(3j Only Kstta la to be ueed for temporary aettlemem wlth a s pemarant houelng
solution, or whare the tepegraphy neoeaaltate for eervicas glantdng purpoaea.
[4j Sfte pegging enty lot •tia toba used fer temporary aattlemant wkh a permanent
solution or pamanent temporary area
[7j When appltcabla.
Rb0 78B.SO
] R#4441.00
R 6e s48.a0
R 3B M7.BO R65 8SS,00” R 41 030.66
R 89 947.97
R 11B 587.04
Annexure G
Informal sexlemant upgredlng programmes effect from 1Aprfl 2018 |
Grent amounts avalllble with |
|||||
Phsse 1 |
||||||
Survey, registration, |
particteation, facilitation, |
dispute |
resolution |
etc |
} |
3'X» of project cost |
Geotechnical investigation |
} |
R 120.22 |
||||
Land acquisition |
} |
R 3 423.03 |
||||
Pre-Planning ] |
R 1031.49) |
|||||
Interim engineering services |
R 3 879.45 |
|||||
Detailed town planning |
R 540.93) |
|||||
land surveying and pegging |
R 400.70 |
|||||
Contour survey |
R 80.15 |
|||||
Land survey examination fee |
R 124.22) |
|||||
Civil engineer’s fee |
R 1209.47[ |
|||||
Site supervision fees |
R 304.50] |
|||||
Permanent engineering services provision: B Grade Level: Guideline Amount |
R 35 836.00] |
|||||
Pro |
ect management |
|||||
Relocation grants |
“ ] |
|||||
Transportations and loading costs for people and household effects |
R 513 |
|||||
Soclal service support Including support for the registration of social |
R 387.95] |
|||||
benefits, school registration and other welfare support |
||||||
Relocation food support to households |
R 638.98$ |
|||||
Maximum cost per household |
R 1 540.38] |
|||||
Annexure H
N T M
ational Housing Programme: Social and EAonemfc Amennltles Grant amounu wlth effect from 1April 2018 |
||
ype of facility Cost per facility(Incl VAT} |
||
edical care facility |
R 355 132.49 |
|
Ablution facility If required |
R 331 457.00 |
|
Subtotal: |
R 686 589.4B |
|
1436 project planning and project management |
R 96 122.55 |
|
Subtotal: |
R 781 71R02 |
|
Community hall (S20m*) Inclusive of day care centre and ablution facility |
R 1 410 665.19 |
|
Community park or playground |
R 737 263.37 |
|
Ablutlon facll“ny If required |
R 331 457.00 |
|
Subtotal: |
||
14% project planning and project management |
R 347 113.98 |
|
Subtotal: |
R 2 826 499.53 |
|
Taxi rank |
R 839 805.28 |
|
Ablutlon facility if required |
R 331 457.00 |
|
Subtotal: |
||
1438 project planning and project management |
R 163 976.72 |
|
Subtotal: |
R 1335 Z38.99 |
|
Sports facilities |
||
Grassed field (110mx65m) |
R 1206 489.96 |
|
Combi Court [30mx15m) |
R 221 957.81 |
|
Ablutlon facility if required |
R 331 457.00 |
|
Subtotal: |
R t759 904.77 |
|
14f6 project planning and project management |
R 246 386.6? |
|
Subtotal: |
R 2006 291A4 |
|
Small buslness facilities |
R 761 458.06 |
|
Ablutloh facility If requlre0 |
R 331 457.0 |
|
Subtotal: |
R 1092 915.0 |
|
14f6 project planning and project management |
R 153 008.11 |
|
Subtotal: |
R 1Z45 923.1Y |
|
Subtotal excl. planning and project management fees |
||
Total project pinning and project management fees |
R L 006 608XI0 |
|
Grand Total |
R 8 196 665.15 |
|
0
£
Summary ofhousingsubsldy quantum and Grant levels Izo National Housing Programmes. 2017/2018
Applicable from 3 April 2O18
Annexure I
}_*»•›oP'»siamme: i•aiwiw Isuaeilneam«u{uwImvmam«um j j
land cost Perslte Services (Top Stzcuture )TotaI subsidy/ Grant (Variance [lndMd0étiIJogsl@›SubsItIIe! z'— fiR‘6*DXiXXI — -R'45"985!tXJ( 'R116'gB7 ' ° " M2g8 852.00 None
tR0P: A Grade Servfces R 6 00t 00 R 4S 98s.QJ/ R116 867.00( R168 852.00 None
[RDP: B Grade Serives R 6 000.00 R 36 258.00[
R116 867.00|
R 159 125.00 /None
(CoftSDlfdatfon Subsidy R 0.00 R 0.00 R116 867.00( R116 867.00 No land and transfer fees Institutional Housing Subsidy R 0.00 RO.00 R116 867.00 R116 867.00 No land and services cost E 'HI' R 6 000.00 R 45 985.00 R116 867.00 R 16B 852.00 None
No land, B grade senses and
Rural Housing Subsidies
Farm Residents Housing Subsidies Disabled Wheelchair House Military vets I-louse
R 0.00 R 36 258.00 R116 857.00
RO.00 R29348.00 R116667.00 R6000.00 R4S985.00 R172929.00 R6000.00 R45985.00 R199014.IXP
R 153 125.00 no transfer fees
No land, B grade derives and R 146 215.00 no transfer, fees no planning R 224 914.00 Special top mucture
R 250 999.00 Special top structure plus
Phase one Phase Two
Total plus indirect cost
Emergency Housing Assistance: Temporary services
Temporary shelter
Repair to existing services B Grade Repair to existing serfces A Grade Repair to exlstln houses 3o sqm Repair to existing houses 40 sqm
Replacement of houses
R6000.00) R9863.00
( R469S0.00
| R52227.00
R 6 000.00) R S 056.00
) R 36 256.00
R 45 931.00
R 0.OJ R 0.tXI
R 57 790.00
R 115 568.IXI
R S8 227.00 Only services and land cost
R 68 846.00 Land,Temp serv and Shelter
R 36 258.00 Just derives repair
R 45 931.00 Just serives repair
R 41931.00 Previous 30 sqm house
R 89 946.00 Previous 40 sqm house
Current SANS 10400 house, no
R zis sss.oo transefer and ben. admin.