People's Assembly

Connecting people with their representatives

  • About us
    • Who we are
    • Source Data
    • For Representatives
  • Contact us
  • Facebook
  • Twitter
  • Instagram
  • menu
  • search
  • Home
  • Rep Locator
  • People
    • Find by name
    • Parliament
      • National Assembly
      • National Council of Provinces
    • Provinces
      • Eastern Cape
      • Free State
      • Gauteng
      • KwaZulu-Natal
      • Limpopo
      • Mpumalanga
      • Northern Cape
      • North West
      • Western Cape
  • Blog
  • MP Profiles
  • MP Attendance
  • Public Participation
    • Make yourself heard
    • Elections
      • Election 2014 Candidates
      • Election 2019 Candidates
    • Petitions
    • Write to a Committee
  • Hot Topics
    • Questions
    • MP Assets
    • MP Corner
    • Infographics
  • Home »
  • Questions »
  • Questions asked to the Minister of Human Settlements, Water and Sanitation

2020-w2453 - 02 December 2020

  • ← 2020-w1832 - 27 November 2020
  • 2020-w2599 - 02 December 2020 →
  • Picture of Hlanganani Siphelele Gumbi
    Gumbi, Mr HS question
    (1)(a) What is the total annual water allocation from the Oranje-Fish River Tunnel scheme that diverts water from the Gariep Dam to the Fish River Valley to the Nelson Mandela Bay Metropolitan Municipality (NMBMM) and (b) who or what manages the specified water allocation to NMBMM; (2) whether the NMBMM utilises its full water allocation; if not, why not; if so, what are the relevant details; (3) whether there is any possibility that the NMBMM may receive an increased annual water allocation in future; if so, what infrastructure upgrades has she found could possibly ensure increased efficiency and reduce water losses in the system that supplies NMBMM?
    Source Link in context Link
  • Minister of Human Settlements, Water and Sanitation answer

    (1)(a) The total annual water allocation from the Orange River System through the Oranje-Fish Tunnel scheme that diverts water from the Gariep Dam to the Fish and Sundays Rivers to the Nelson Mandela Bay Metropolitan Municipality (NMBMM) is 58,3 million m3/annum.

    (b) The water allocation is ensured through the Annual Operating Analysis of the Orange River System as well as Algoa Water Supply System, of which the NMBMM is part of the Stakeholders Operating Forum (SOF). The NMBMM operates the relevant infrastructure that provides potable water to municipal users.

    (2) The NMBM is utilising its full allocation at present.

    (3)(a) The Department of Water and Sanitation (DWS) issued a license to NMBM to abstract a total of 58.3 million m3/a of water from the Orange River, with the proviso that the license could be reduced back to 22 million m3/a after 20 years (by 2031). However, NMBM has requested that the license be made permanent on account of its high capital investment. The potential for further allocation in line with potential efficiency savings, to be obtained along the OFS transfer route has been considered and can be considered further, depending on the success of efficiency measures introduced. An additional allocation of 18.25 million m3/a has been recommended, to be made available from water saved through efficiency measures introduced, which could potentially be developed as a Phase 4 of the Nooitgedagt Low Level Scheme.

    (b) The Orange River Project/Nooitgedacht Low-Level Scheme is one of the interventions with the following upgrades to possibly ensure increased efficiency and reduce water losses in the system that supplies NMBMM:

    • Concrete-lining of the 500 km of earth canals in the Great Fish River Water User Association (GFRWUA) area of jurisdiction by the Water Users Associations (WUA).
    • Improved measuring and monitoring in the GFRWUA and Lower Sundays River Water User Association (LSRWUA) areas of jurisdiction by DWS for flow measurements and the WUAs on actual water use measurements.
    • Removal of reeds along the Great Fish River by the WUAs and the working for programmes.
    • Optimisation of operational releases made at the Elandsdrift and De Mistkraal weirs to be implemented in a step-wise manner by DWS – this involves a revival of the existing Real-Time model.
    • Refurbishment of the Darlington Dam which is currently being evaluated by the Infrastructure unit of DWS.
    Source Link in context Link
  • ← 2020-w1832 - 27 November 2020
  • 2020-w2599 - 02 December 2020 →

Correct this page

Follow us

  • Facebook
  • Twitter
  • Instagram

Sitemap

  • Home
  • Rep Locator
  • People
    • Find by name
    • Parliament
      • National Assembly
      • National Council of Provinces
    • Provinces
      • Eastern Cape
      • Free State
      • Gauteng
      • KwaZulu-Natal
      • Limpopo
      • Mpumalanga
      • Northern Cape
      • North West
      • Western Cape
  • Blog
  • MP Profiles
  • MP Attendance
  • Public Participation
    • Make yourself heard
    • Elections
      • Election 2014 Candidates
      • Election 2019 Candidates
    • Petitions
    • Write to a Committee
  • Hot Topics
    • Questions
    • MP Assets
    • MP Corner
    • Infographics
  • Links
  • Get the data

Contact us

People's Assembly
contact@pa.org.za

Tel: (021) 465 8885

Fax: (021) 465 8887

2nd Floor 9 Church Square Parliament Street
Cape Town 8001
South Africa

Disclaimer

The data for this site has been sourced form a range of organisations and websites and often received in formats that are hard to process. As a result, errors can occur - if you see something that you think is an error, please click on the "Correct This Page" button and let us know so that we can investigate. Please click here to read more about our source data.

  • Privacy
  • Give us feedback

This site runs on open source code written by mySociety.