a) Summary reports for each region indicating the number of maintenance events per region per sub-area of the asset for electrical, Perway (track) and Signal infrastructure.
b) Detail of the report: (planned = preventative maintenance jobs scheduled)
Perway / Track:
Electrical:
SIGNALS:
In Gauteng addressing faults occurring in the signal system has priority over planned maintenance.