(1) Land housing projects undertaken in Bela-Bela, Limpopo a) There is no collaboration agreement that was signed between the Housing Development Agency and Bela-Bela Municipality. However, as a result of relevant agreements between the Department of CoGHST A in Limpopo and HDA, the following were activities undertaken by the HOA in Bela-Bela Municipality:
(i) Period 2006 - 2011
The HDA assisted the Department in the acquisition of land (Erf. 1491 Warmbaths Ext.25). The price of the land that was paid by CoGHSTA to the land owner is R 65.4m.
(ii) Period 2011 - 2016
The HDA completed township establishment on Erf. 1491 Warmbaths Ext.25 in 2012/2013 financial year. The amount for rezoning and subdivision was R420 664. The project was completed. During 2015/16 financial year, the HDA completed installation of interim basic services on Erf.1491 Warmbaths Ext.25. This involved the following:
(a) Sewer:
• Supply and installation of 587m of Sewer pipeline, which involved construction of 9 manholes and connection to existing sewer line.
• Supply and connection of fittings to ablution facilities
(b) Water:
• Supply and installation of 50mm HDP water supply pipeline.
• Design, supply and installation of steel vertical tanks
• Supply and installation of water tanks
• Additional works, supply and installation of water taps cages
(c) Electrical:
• Supply and installation of lighting
• Supply and installation of a highlight mast.
• Additional work, supply and installation of radiant lighting at ablution facilities
(iii) No projects were undertaken during the 2016 - 2018 period.
b) The cost of the project for the period 2006 - 2011 was R2 104 822.92.
The cost of the project for the 2011 - 2016 period was R6 018 000.00. It was for the engineering designs for bulk and internal engineering services to supply Erf.1491 Warmbaths Ext.25 which was completed during the 2015/16 financial year. The project was completed.
(2) The projects were completed
a) N/A
b) N/A
(i) N/A